pelletron

BARC-TIFR Pelletron LINAC Facility
located at TIFR, Mumbai

The Pelletron Accelerator, set up as a collaborative project between the Bhabha Atomic Research Centre and the Tata Institute of Fundamental Research, has been serving as a major facility for heavy ion accelerator based research in India since its commissioning in December 1988. Several advanced experimental facilities have also been established at this centre to pursue research in nuclear, atomic, condensed matter physics and interdisciplinary areas. A number of application based research programmes have also been taken up using this accelerator. The research work in nuclear physics, which forms the main thrust of activities at this facility, covers areas of nuclear structure studies at high angular momentum and excitation energies and the heavy ion reaction dynamics. The accelerator has now completed 20 years of successful operation, catering to a large community of scientists in the country. While the majority of the researchers at this facility are from BARC and TIFR, the experimental community encompasses scientists and students from other research centres and universities within and outside the country. These past years have been scientifically stimulating and very productive.  More than 80 Ph.D. theses and over 500 publications in refereed international journals  including  15 publications in Physical Review Letters have resulted from the research activities in this laboratory. 

The accelerator has performed exceedingly well in the last two decades delivering beams ranging from proton to Iodine.  Various modifications to improve the performance of the Pelletron accelerator have been implemented.  The accelerator operation fully complies with the guidelines and recommendations of the Particle Accelerator Safety Committee (PASC), the Operating Plant Safety Committee (OPSRC) and the BARC Safety council.

A superconducting linear accelerator has been indigenously developed to boost the energy of heavy ion beams delivered by the Pelletron accelerator.  The superconducting LINAC booster phase I consisting of three accelerating modules was commissioned in 2002.  In July 2007, Silicon ions were accelerated using all seven modules and were transported to the experimental stations in the first user hall.  The performance was excellent with an average energy gain per cavity of 0.4 MV/q corresponding to 80% of the design value.  This national facility was dedicated to users on 28th November 2007 and several experiments have been carried out with LINAC.  Development of the superconducting LINAC is a major milestone in the accelerator technology in our country.  Most of the critical components of the LINAC booster, the first superconducting heavy ion accelerator in India, have been designed, developed and fabricated indigenously.

Bhabahalogobluesmfl

 

v

PLF-Mumbai-Logo

 
Accelerator news

o   Facility layout

o   PELLETRON machine details    recent developments    beam details  beam hall

o   LINAC overview internal  reports  report1 (2002)    report2 (2003)    new beam hall

v User Information

Data acquisition LAMPS

Available Beams & Energies with LINAC

Miscelleneous information

Downloads

 Beam time requisition

 Guest house requisition

User feedback doc pdf

v Beam Schedule

Ongoing Research activities

        A quick overview of activities 1989−2008

·        Nuclear Structure

·         Reaction studies near barrier

·        Fission studies

·        Radio Chemistry studies

·        Atomic Physics

·        Condensed Matter studies

·        Applications

·         Bio-environmental studies

·        Radiation damage studies (reactor materials, space application chips)

·        Radiation biology (proteins, DNA)

·        Accelerator Mass Spectrometry (36Cl/Cl)

·        Track etched membrane (ultra-fine filters)

Publications

·        2000 onwards

·        1989-2000

·        Accelerator & Instrumentation

·        Thesis List

 

LINAC goes online…..

Ø First beam accelerated through LINAC on 22nd Sept.2002

Ø Feb.2003 -Beam diagnostic tests – phase space evolution across the mid-bend magnet tested

 Set up for LINAC beam tests (particle detector +MSP)

 Energy gain, Timing, Longitudinal Phase space evolution

Ø April 2003 - LINAC beam cycle

started on 16th April  2003,  with  49 MeV Energy gain for Si13+

PLUM (Fission Hindrance in 28Si+175Lu)   Phys. Rev. C 73, 064609 (2006)

GRAPE (GDR in 28Si+124Sn)  Nucl. Phys. A 770, 126 (2006)

Ø 24th Jan 2004 - 58Ni (23+) accelerated to 210.9 MeV through LINAC

Ø Full LINAC tested successfully  in July 07 (Energy gain)

Average energy gain ~ 80% of design value

Ø User experiments  continuing since  Nov. 07

Ø Accelerator control and instrumentation

 

Dr. A.P.J. Abdul Kalam’s visit to LINAC (June 2010)

  DSC_1431_2.JPG   DSC_1467_1.JPG   DSC_1442_1.JPG      

            INGA @PLF, Mumbai (2010-..)

           inga_jan11.tif  ingadaq_jan11.tif

 

v   Picture Gallery

Ø   Experimental setups

Ø   Pelletron

Ø   LINAC

 

Upcoming events

·       ANUP11 Advances in Nuclear Physics, an ICTS programme (7th to 17th Nov. 2011)

 

 

Future Projects

 

·       MARIE (Light RIB separator)

·      

 

 

  

   STRUCTURE DNAP       atombt BARC     daelogoDAE   ISPA  konark  useful links 

 

 

 

Image1  Send your comments/suggestions to Vandana Nanal / K. Ramachandran